Anybody know approx how long this will take? I have offered to have it done since it has been 7 years on 00W. I'm thinking it could (probably will) turn into a multi day event. Only the plus side, the tanks were out 7 years ago and the screws aren't painted.
I'll get the parts and stuff mentioned the last time I asked (viewtopic.php?f=5&t=1753&hilit=SB1006#p18182)
I offered to do the inspection and offered to let his mechanic take a peek but he's flying in and would want to fly the plane too.
I'm thinking let him fly in, we'll go for the test ride, he can have his mech do a pre buy or whatever if still interested, I'll have the tanks pulled that day (This could be done in a long afternoon couldn't it?). Then put it back together, however long that takes.
I'll get the parts and stuff mentioned the last time I asked (viewtopic.php?f=5&t=1753&hilit=SB1006#p18182)
I offered to do the inspection and offered to let his mechanic take a peek but he's flying in and would want to fly the plane too.
I'm thinking let him fly in, we'll go for the test ride, he can have his mech do a pre buy or whatever if still interested, I'll have the tanks pulled that day (This could be done in a long afternoon couldn't it?). Then put it back together, however long that takes.